Page 11

← Prev: (2) Any residential... Next: by the Planning a... →
YAVAPAI COUNTY PLANNING AND ZONING ORDINANCE Page 11 (16) Well houses under 200 square feet are exempt from the definition of structure and not subject to yard setbacks, provided that access sight distance requirements are met as referenced in the definitions. (17) Amateur radio antennas and support structures, subject to a 1 ft. for 1 ft. setback from all property lines and easements. FAA and FCC requirement shall still apply. Should anyone wish to have any deviation from this code they may apply for relief through a Use Permit. c. Signs do not require regular Zoning Clearances but do require sign permits as provided in Section 601. d. The exemption of an object or improvement from the requirement for a Zoning Clearance does not remove such object or improvement from the requirement to comply with all other regulations of this Ordinance and other codes. 2. Zoning Clearance Issuance: No clearance referencing the utilization of a licensed contractor shall be issued without first confirming the referenced license is in good standing utilizing information provided by the Arizona Registrar of Contractors. For each clearance issued the Land Use Specialist shall provide: a. To the applicant, a fee receipt and a place card of a distinctive and easily identifiable color that shall state permit number, the date issued, and the work authorized thereby. b. To the Department’s files, one (1) copy of the fee receipt and one (1) copy of the permit data and drawing. 3. Information Required: a. Assessor's Parcel Number identifying the property. b. Street address, if any, legal description of the property, and dimensions thereof. In the case of a metes and bounds parcel, which is a parcel that is not part of a recorded subdivision, a copy of the recorded legal description must be submitted with the application. c. The location of any creek, river, or dry wash on or within two hundred feet (200’) of the property and/or the establishment of the property location with respect to determined floodplains. Any property within a delineated floodplain (flood way or flood fringe) must have approval from the Yavapai County Flood Control District prior to issuance of a zoning clearance, building and/or grading permit. d. A permit or statement of approval from the County Environmental Unit concerning the sanitary system and facilities; or evidence of hookup to an existing sewer system; or evidence of a state-approved system. e. A culvert permit issued by the County Public Works Department, if the property abuts a County road. f. Nature of the proposed use of the structure and premises and true value of the structure. g. Commercial, industrial, multi-family, or non-residential uses or structures require additional information concerning such matters as parking, signs, screening, landscaping, lighting, drainage and similar details. These items require review
← Prev: (2) Any residential...
Next: by the Planning a... →
Yavapai AI Assistant
Hello! I'm here to help with your Planning & Zoning questions. How can I assist you today?