YAVAPAI COUNTY PLANNING AND ZONING ORDINANCE
Page 37
substantial property rights. One (1) extension of time for use of a recreational vehicle, travel
trailer, park model or single-wide manufactured home as temporary housing may be granted at
the discretion of the Development Services Director for a period not to exceed twelve (12)
months. Further extensions will require a Use Permit.
I. Bed & Breakfast Homestays as defined under Section 301 (Definitions), subject to performance
standards set out in Section 507 (Bed and Breakfasts) for Homestays with Administrative Review
with Comment Period.
J. One (1) guest home as defined under Section 301 (Definitions), subject to the performance
standards set out in Section 537 (Guest Home): with a minimum parcel size of seventy thousand
(70,000) square feet.
K. Home Occupations as defined under Section 301 (Definitions), subject to approval by the
Development Services Director; home occupation shall comply with the regulations and
standards set out in Section 543 (Home Occupation).
L. Secondary Medical Dwelling Variance for medical hardships as defined under Section 301
(Definitions), subject to performance criteria found in Section 525 (Dwelling – Secondary
Medical) and dwelling unit to conform to applicable zoning district performance criteria.
M. Private family cemeteries for the internment of human remains, with an Administrative Review
with Comment Period subject to the following criteria:
1. Notification area for the Administrative Review with Comment Period is one thousand
(1,000) feet from the property boundary.
2. Property owner to delineate cemetery boundary with a minimum three foot (3’) fence.
3. The application shall include a paper copy of a scale map, titled “Results of Survey” or
similar, with the parcel area and dimensions showing existing parcel lines and all
proposed easements. The map/survey shall be sized 18” x 24” (one 8.5” x 11” copy must
also be submitted) or of a format acceptable to the County Recorder’s Office. The legal
descriptions and the map/survey shall be prepared by an Arizona Registered Land
Surveyor.
4. Cemetery to be recorded as a perpetual easement attached to a main parcel including
ingress/egress access, within thirty (30) days of approval.
5. Cemetery is prohibited from becoming a separate tax parcel and must maintain minimum
zoning district requirements.
6. If a private family cemetery is a primary use, no accessory uses are allowed.
7. A private family cemetery must meet primary setbacks.
N. Community Gardens as defined under Section 301 (Definitions), subject to performance criteria
set out in Section 512 (Community Garden).
O. Wireless Communication Facility
1. Minimum Parcel size to be 2 acres (87,120 SQUARE FEET)
2. Maximum height to be 60 feet.
3. Towers must be set back from any lot line a distance equal to at least one hundred percent
(100%) of the height of the tower unless proof of collapse is provided by a registered engineer,
then primary setbacks shall apply.